Default Day to Rectify Defects

Sets the default number of days an assigned Sub Contractor has to resolve the defect. When a new defect is created and assigned a Sub Contractor the ‘Due by Date’ will automatically be populated with a date in the future that is the current date, plus the specified number of days.